Veličina
71 m²
Parcela
80 m²
Sprat
prizemlje
Br. soba
3
Br. spavaćih soba
2
Br. kupatila
1
Opis
Krk, uvala Soline. Prizemni apartman s okućnicom, 700m. od mora
Apartman u prizemlju stambene površine 71 m2, sastoji se od : dvije spavaće sobe, dnevni boravak s kuhinjom sa blagovaonicom, hodnik, kupaonica, toalet, terasa s izlazom na okućnicu površine cca 80 m2.
Kvalitetna gradnja, klima uredaj, PVC stolarija sa komarnicima. Kvalitetna talijanska keramika, te kupaonsko sanitarna oprema.
Parkirno mjesto površine 12,5 m2. PDV u cijeni.
Apartman se prodaje po sistemu „ključ u ruke“
Planirani završetak radova 06/2024.
Apartman u prizemlju stambene površine 71 m2, sastoji se od : dvije spavaće sobe, dnevni boravak s kuhinjom sa blagovaonicom, hodnik, kupaonica, toalet, terasa s izlazom na okućnicu površine cca 80 m2.
Kvalitetna gradnja, klima uredaj, PVC stolarija sa komarnicima. Kvalitetna talijanska keramika, te kupaonsko sanitarna oprema.
Parkirno mjesto površine 12,5 m2. PDV u cijeni.
Apartman se prodaje po sistemu „ključ u ruke“
Planirani završetak radova 06/2024.
Krk, Soline bay. Ground floor apartment with garden, 700m. close to sea.
Ground floor. 71 m2 of living space, consists of: two bedrooms, living room with kitchen and dining area, hallway, bathroom, toilet, terrace with access to the garden of approx. 80 m2.
Quality construction, air conditioning system, PVC joinery with mosquito nets. Quality Italian ceramics and bathroom sanitary equipment.
Parking space of 12.5 m2.
VAT included in price.
The apartment is sold according to the "turnkey" system.
Planned completion of works 06/2024.
Ground floor. 71 m2 of living space, consists of: two bedrooms, living room with kitchen and dining area, hallway, bathroom, toilet, terrace with access to the garden of approx. 80 m2.
Quality construction, air conditioning system, PVC joinery with mosquito nets. Quality Italian ceramics and bathroom sanitary equipment.
Parking space of 12.5 m2.
VAT included in price.
The apartment is sold according to the "turnkey" system.
Planned completion of works 06/2024.